ADVERTISEMENT

Train project: Lagos to begin passenger carriage by Jan 2023 – Sanwo-Olu

Governor Babajide Sanwo-Olu of Lagos State on Sunday said that the Red Line Train project would begin test-run of conveying passengers by Jan. 2023.

L-R: Director, Rail Transportation, Lagos Metropolitan Area Transport Authority (LAMATA), Mr Olasunkanmi Okusaga; Managing Director, LAMATA, Mrs Abimbola Akinajo; Lagos State Gov. Babajide Sanwo-Olu; his Deputy, Dr. Obafemi Hamzat and Special Adviser to the Governor on Works & Infrastructure, Mrs Aramide Adeyoye during the inspection of the ongoing works on the Red Rail project sites, on Sunday, Aug. 7, 2022.

Sanwo-Olu said this while addressing newsmen, after the inspection of the Red Line Train Project at Agege, Ikeja, Mushin and Ebute Meta areas of the state.

He assured residents that full operations on the Red Line project would start in the first quarter of 2023.

According to him, work at the various locations of the train stations is on track, hence, first quarter 2023 operation is sacrosanct.

”We are trying to ensure that we even exceed the promise that we made, the promise that the operations will start first quarter 2023.

ADVERTISEMENT

”So what we are doing is to ensure that the physical infrastructure are completed by December latest; all stations, all bridges, all walkways, all pedestrian bridges by December, so that they can start testing.

”Operationally, it will take two to three months, you need to check the signal, check the senses of all the signalisation that you have.

“So, we are hoping that the operations will start within the first quarter of 2023. January we will start carrying passengers,” he said.

At the inspection which commenced from Agege-NRC Station where passengers from Ibadan would join the Intra-city train service to other stations, the governor said that work would be completed by October.

He describe the Ikeja Station as an iconic station on the Red Line, assuring that every infrastructure to make the station a first-class was in place and would equally be completed by October.

ADVERTISEMENT

”That station is on a wide expanse of about 240 meters; in clear term, that is the size of almost three football fields.

”It is at roof level, it is going into completion and all of the things, all of the furniture that needs to make it a first class train station are in place, you can see that we are on track with it,” Sanwo-Olu said.

For the Mushin train station and it’s linking bridge, he said that several demolitions were done and the state government had paid extensive amount for buildings affected, hence, work was in progress.

JOIN OUR PULSE COMMUNITY!

Unblock notifications in browser settings.
ADVERTISEMENT

Eyewitness? Submit your stories now via social or:

Email: eyewitness@pulse.ng

Recommended articles

Hajj Commission thanks 'Christian Uzodinma' for being its pillar of support

Hajj Commission thanks 'Christian Uzodinma' for being its pillar of support

Why our plane made emergency landing at Lagos airport, Air Peace clarifies

Why our plane made emergency landing at Lagos airport, Air Peace clarifies

Over 75% of Katsina children are multidimensionally poor – UNICEF

Over 75% of Katsina children are multidimensionally poor – UNICEF

PDP unveils 200-member campaign council for Ighodalo's guber election in Edo

PDP unveils 200-member campaign council for Ighodalo's guber election in Edo

Tinubu approves resumption of repair work on Third Mainland Bridge

Tinubu approves resumption of repair work on Third Mainland Bridge

Ondo Poll: Ganduje consoles Jimoh Ibrahim after crushing defeat in APC primary

Ondo Poll: Ganduje consoles Jimoh Ibrahim after crushing defeat in APC primary

FG to review recent price hike of DStv, GOtv packages amid public outcry

FG to review recent price hike of DStv, GOtv packages amid public outcry

BREAKING: FG grants Air Peace right to commence Abuja-London flights - Keyamo

BREAKING: FG grants Air Peace right to commence Abuja-London flights - Keyamo

Deputy who dumped Akeredolu clinches PDP governorship ticket

Deputy who dumped Akeredolu clinches PDP governorship ticket

ADVERTISEMENT
ADVERTISEMENT